Type: General Category: General Tags: Subject: Procedure for DUT(4Cols,30um) Preparation ====== Procedure for DUT(4Cols,30um) Preparation ====== Line-3: 1. Record drawing currents in line-3. 2. Shutoff all HV and LVs in line-3. 3. Disconnect all cables of 4Cols30um sensor and remove. 4. Install 4Cols20um sensor to line-3 and reconnect all cables. 5. Turn on LV and HV. HV suppose to be changed from 198V to 123V. 6. Confirm the current came to the same. Line-2: 1. Shutoff LVs and HVs. Shutoff HVs for scintillators and MCP-PMT. 2. Wait for 5 minutes. 3. Disconnect all cables of DUT 2Cols30um sensor and remove the fixture. 4. Install 4Cols30um sensor took out from the Line-3 and reconnect all cables. 5. Turn on LV and HV of the DUT. HV suppose to be set 198V as it is. Turn on HVs for scintilllators and MCP-PMT.