Type: General Category: General Tags: Subject: Daily meeting note (3.5) ====== Daily meeting note (3.5) ====== * **Line#2** * New alignment has been done during the night shift (MCP-PMT 100%, overall 80% coincidence) * Power glitch observed * Log1: https://www.cns.s.u-tokyo.ac.jp/~lim/elog/doku.php?id=2026-03_raris:126 * Log2: https://www.cns.s.u-tokyo.ac.jp/~lim/elog/doku.php?id=2026-03_raris:127 * Suggestion from Simone: additional data measurement with special DUT jig (col-row type) -> will be done after this measuremnt * Data taking plan will be completed by tomorrow -> any further measurement plan? * We should check the data quality by tonight for ensuring * **Line#1** * Setupdone, Data taking ongoing -> rough timing resolution obtaind: AC-LGAD ~100 ps * RCNP - individual Streaming daq setup along with Kaneta-san's setup * Setup: EDM4EIC format root file can be used now -> EICRecon can be used (tested with another data) * From now on, test beam data can be streamed to the DAQ system. * EICRecon full configuration -> geometry is not included -> this has to be done (geometry, module number, etc) <- maybe too heavy for testing purpose? * Data root file -> Xrootd system is ready but not used now (no such a benefit ) * **Line#3** * HV-dependent measurment is on going. * Current measurment: Now 4 col 50 um (back) 4 col 20 um (front) * QA plot: under preparation * some of channel shows zero(0) noise -> strange, under investigation now.