Type: General Category: General Tags: Subject: March 4th Daily meeting minutes ====== March 4th Daily meeting minutes ====== Line-2 Report: - Coarse horizontal scan of 2Col50um sensor is ongoing. Will optimize the center position after the scan. - We will swap the trigger counter-1 fixture once Kentaro produces new parts using 3D printer. Needs alignment again after this. - Bong-Hwi recommends not to include channel 1 and 8 in the tracking analysis. Simone and Bong-Hwi should coordinate to pursue the analysis rather than independent analysis. - According to Simone, 10k events/run should be sufficient. Currently the beam power is 70%. Request full power. Line-1 Report: - Successful data taking with NestDAQ. Need access for 5 minutes with oscilloscope for recording purpose. - Access right after the meeting. Line-2 Report: - Logic fileter using GPU is done. Simple test looks good. - EDM4eic coding ongoing. - Planning to test EDM4eic tomorrow. - Testing two different servers with/without GPU. Line-3 Report: - Done with HV scan of 2Col50um. - Will install 4Col50um with noHole and 4Col30um next. 4Col50um suppose to be installed downstream. - 15 minutes access for swapping sensor setup. Control room shift : Maya (~1AM), Satoshi (1AM ~ 9AM).