Line-2 Report:
Coarse horizontal scan of 2Col50um sensor is ongoing. Will optimize the center position after the scan.
We will swap the trigger counter-1 fixture once Kentaro produces new parts using 3D printer. Needs alignment again after this.
Bong-Hwi recommends not to include channel 1 and 8 in the tracking analysis. Simone and Bong-Hwi should coordinate to pursue the analysis rather than independent analysis.
According to Simone, 10k events/run should be sufficient.
Currently the beam power is 70%. Request full power.
Line-1 Report:
Line-2 Report:
Line-3 Report:
Done with HV scan of 2Col50um.
Will install 4Col50um with noHole and 4Col30um next. 4Col50um suppose to be installed downstream.
15 minutes access for swapping sensor setup.
Control room shift : Maya (~1AM), Satoshi (1AM ~ 9AM).