🔗 http://www.cns.s.u-tokyo.ac.jp/~lim/elog/doku.php?id=2026-02_kek:229
Data taking plan
13:00 ~: 0.8 GeV for validating the RARiS energy, maximum 0.2M events
(There will be intervention from Kobe group)
15:20 ~ 16:00: 4 GeV, Strip + W-plate → we need to detach the DUT to install W-plate behind (this means we need to double check the alignment)
17:00 ~ 19:00: Detach MCP-PMT, intall AstroPix, remove W-plate
19:00 ~: RFSoC runs
~09:00: Finish data taking