🔗 http://www.cns.s.u-tokyo.ac.jp/~lim/elog/doku.php?id=2026-03_raris:112
Thread
Replies (1):
Procedure for DUT(4Cols,30um) Preparation
Line-3:
- Record drawing currents in line-3.
- Shutoff all HV and LVs in line-3.
- Disconnect all cables of 4Cols30um sensor and remove.
- Install 4Cols20um sensor to line-3 and reconnect all cables.
- Turn on LV and HV. HV suppose to be changed from 198V to 123V.
- Confirm the current came to the same.
Line-2:
- Shutoff LVs and HVs. Shutoff HVs for scintillators and MCP-PMT.
- Wait for 5 minutes.
- Disconnect all cables of DUT 2Cols30um sensor and remove the fixture.
- Install 4Cols30um sensor took out from the Line-3 and reconnect all cables.
- Turn on LV and HV of the DUT. HV suppose to be set 198V as it is. Turn on HVs for scintilllators and MCP-PMT.