Logged in as: Guest
Login
: 2026-03_raris:131
🔗 http://www.cns.s.u-tokyo.ac.jp/~lim/elog/doku.php?id=2026-03_raris:131
Subject: Daily meeting note (3.5)Type: GeneralCategory: GeneralTags: None

Daily meeting note (3.5)

  • Line#2
  • Line#1
    • Setupdone, Data taking ongoing → rough timing resolution obtaind: AC-LGAD ~100 ps
    • RCNP - individual Streaming daq setup along with Kaneta-san's setup
      • Setup: EDM4EIC format root file can be used now → EICRecon can be used (tested with another data)
        • From now on, test beam data can be streamed to the DAQ system.
        • EICRecon full configuration → geometry is not included → this has to be done (geometry, module number, etc) ← maybe too heavy for testing purpose?
      • Data root file → Xrootd system is ready but not used now (no such a benefit )
  • Line#3
    • HV-dependent measurment is on going.
      • Current measurment: Now 4 col 50 um (back) 4 col 20 um (front)
    • QA plot: under preparation
      • some of channel shows zero(0) noise → strange, under investigation now.