Daily meeting note (3.5)
- Line#2
- New alignment has been done during the night shift (MCP-PMT 100%, overall 80% coincidence)
- Power glitch observed
- Suggestion from Simone: additional data measurement with special DUT jig (col-row type) → will be done after this measuremnt
- Data taking plan will be completed by tomorrow → any further measurement plan?
- We should check the data quality by tonight for ensuring
- Line#1
- Setupdone, Data taking ongoing → rough timing resolution obtaind: AC-LGAD ~100 ps
- RCNP - individual Streaming daq setup along with Kaneta-san's setup
- Setup: EDM4EIC format root file can be used now → EICRecon can be used (tested with another data)
- From now on, test beam data can be streamed to the DAQ system.
- EICRecon full configuration → geometry is not included → this has to be done (geometry, module number, etc) ← maybe too heavy for testing purpose?
- Data root file → Xrootd system is ready but not used now (no such a benefit )
- Line#3
- HV-dependent measurment is on going.
- Current measurment: Now 4 col 50 um (back) 4 col 20 um (front)
- QA plot: under preparation
- some of channel shows zero(0) noise → strange, under investigation now.