Day Shift Program
Following is the program for this monring:
— DUT( 2Col,50um) x-Position Scan —
- Keep the Trigger Rates from the current run as the reference. ~10Hz (screenshot in “Print” folder).
- Measure current position of Trigger counter-2.
- Put marker on the DUT at Laser height.
- Remove the trigger counter-2
- Relocate trigger counter-2 between LGAD-5 and MCP-PMT
- Measure x-position of the DUT
— post trirger counter position change —
- X-check rates after the trigger counter-2 relocation. Fine tune alignment until we reproduce coincidence trigger rates of ~10 Hz.
- Execute DUT x-position scan (0, -3, +3, -6, +6, 0mm) : Actual entry for this sequence 0 → -3.0 → +6.0 → -9.0 → +12.0 → -6.0
— Aligntment optimization — Fine tune alignment relative position of trigger counters, trackers, and DUT.
— DUT( 2Col,30um) x-Position Scan —
- Remove DUT( 2Col,50um) from Line-2
- Take 1hour run without DUT @ nominal position (x=0)
- Take (2Col30um) sensor out from Line-3 and install (4Col30um) to Line-3.
- Install (2Col30um) sensor to DUT in Line-2.
- Repeat x-Pos scan (0, -3, +3, -6, +6, 0mm) : Actual entry for this sequence 0 → -3.0 → +6.0 → -9.0 → +12.0 → -6.0