March 4th Daily meeting minutes
Line-2 Report:
- Coarse horizontal scan of 2Col50um sensor is ongoing. Will optimize the center position after the scan.
- We will swap the trigger counter-1 fixture once Kentaro produces new parts using 3D printer. Needs alignment again after this.
- Bong-Hwi recommends not to include channel 1 and 8 in the tracking analysis. Simone and Bong-Hwi should coordinate to pursue the analysis rather than independent analysis.
- According to Simone, 10k events/run should be sufficient.
Currently the beam power is 70%. Request full power.
Line-1 Report:
- Successful data taking with NestDAQ. Need access for 5 minutes with oscilloscope for recording purpose.
- Access right after the meeting.
Line-2 Report:
- Logic fileter using GPU is done. Simple test looks good.
- EDM4eic coding ongoing.
- Planning to test EDM4eic tomorrow.
- Testing two different servers with/without GPU.
Line-3 Report:
- Done with HV scan of 2Col50um.
- Will install 4Col50um with noHole and 4Col30um next. 4Col50um suppose to be installed downstream.
- 15 minutes access for swapping sensor setup.
Control room shift : Maya (~1AM), Satoshi (1AM ~ 9AM).