March 4th Daily meeting minutes

Line-2 Report:

  • Coarse horizontal scan of 2Col50um sensor is ongoing. Will optimize the center position after the scan.
  • We will swap the trigger counter-1 fixture once Kentaro produces new parts using 3D printer. Needs alignment again after this.
  • Bong-Hwi recommends not to include channel 1 and 8 in the tracking analysis. Simone and Bong-Hwi should coordinate to pursue the analysis rather than independent analysis.
  • According to Simone, 10k events/run should be sufficient.

Currently the beam power is 70%. Request full power.

Line-1 Report:

  • Successful data taking with NestDAQ. Need access for 5 minutes with oscilloscope for recording purpose.
  • Access right after the meeting.

Line-2 Report:

  • Logic fileter using GPU is done. Simple test looks good.
    • EDM4eic coding ongoing.
    • Planning to test EDM4eic tomorrow.
    • Testing two different servers with/without GPU.

Line-3 Report:

  • Done with HV scan of 2Col50um.
  • Will install 4Col50um with noHole and 4Col30um next. 4Col50um suppose to be installed downstream.
  • 15 minutes access for swapping sensor setup.

Control room shift : Maya (~1AM), Satoshi (1AM ~ 9AM).