2026-03 RARiS
Shared album
| ID | Date | Author | Type | Category | Subject |
|---|---|---|---|---|---|
| 179 | Fri Apr 24 14:01:25 2026 | Bong-Hwi Lim | General | Beam3_RFSoC | Re: RFSoC channel and DUT sensor channel correspondence |
ReplyTo: 161
Re: RFSoC channel and DUT sensor channel correspondenceBoard1 row1-8: rfsoc1 ch0 Board1 row1-6: rfsoc1 ch1 Board1 row1-4: rfsoc1 ch2 Board1 row1-2: rfsoc1 ch3 Board1 row1-7: rfsoc3 ch0 Board1 row1-5: rfsoc3 ch1 Board1 row1-3: rfsoc3 ch2 Board1 row1-1: rfsoc3 ch3 Board1 row2-1: rfsoc2 ch0 Board1 row2-3: rfsoc2 ch:1 Board1 row2-5: rfsoc2 ch2 Board1 row2-7: rfsoc2 ch3 Board1 row2-2: rfsoc4 ch0 Board1 row2-4: rfsoc4 ch1 Board1 row2-6: rfsoc4 ch2 Board1 row2-8: rfsoc4 ch3 Board2 row1-8 rfsoc1 ch4 Board2 row1-6: rfsoc1 ch5 Board2 row1-4: rfsoc1 ch6 Board2 row1-2: rfsoc1 ch7 Board2 row1-7: rfsoc3 ch4 Board2 row1-5: rfsoc3 ch5 Board2 row1-3: rfsoc3 ch6 Board2 row1-1: rfsoc3 ch7 Board2 row2-1: rfsoc2 ch4 Board2 row2-3 rfsoc2 ch:5 Board2 row2-5: rfsoc2 ch6 Board2 row2-7: rfsoc2 ch7 Board2 row2-2: rfsoc4 ch4 Board2 row2-4: rfsoc4 ch5 Board2 row2-6: rfsoc4 ch6 Board2 row2-8: rfsoc4 ch7 | |||||
| 178 | Sat Mar 07 01:20:03 2026 | Hiroki Iizuka | General | Beam3_RFSoC | Re: pixel-type AC-LGAD : 3/6 20:30~ |
ReplyTo: 176
Re: pixel-type AC-LGAD : 3/6 20:30~Run 174 を動かしたまま、一晩放置します | |||||
| 177 | Sat Mar 07 01:05:07 2026 | Hiroki Iizuka | General | General | Beam 周期変更 |
Beam 周期変更ビーム周期が、10sON-20sOFF の30s から10sON-17sOFFの27s に変更されました | |||||
| 176 | Sat Mar 07 00:47:07 2026 | koyuki iwatsuki | General | Beam3_RFSoC | pixel-type AC-LGAD : 3/6 20:30~ |
pixel-type AC-LGAD : 3/6 20:30~
DUT1 : pixel-type AC-LGAD(W7 big ), DUT2 none | |||||
| 175 | Fri Mar 06 20:39:11 2026 | Simone Mazza | General | General | Line 2 double DUT setup |
| 174 | Fri Mar 06 19:42:11 2026 | koyuki iwatsuki | General | Beam3_RFSoC | HV Scan: 3/6 17:00~ |
HV Scan: 3/6 17:00~
DUT1 : 4col-20um, DUT2 4col-50um (nohole) \
RUN | HV1 | I1 | HV2 | I2 | start | stop | time | events | rate | comments | |||||
| 173 | Fri Mar 06 18:10:42 2026 | Bong-Hwi Lim | General | General | Daily meeting note (3.6) |
Daily meeting note (3.6)
| |||||
| 172 | Fri Mar 06 17:35:07 2026 | Tatsuki Saito | General | Beam3_RFSoC | HV Scan: 3/6 12:53~17:33 |
HV Scan: 3/6 12:53~17:33
DUT1 : 4col-20um, DUT2 4col-50um (nohole) | |||||
| 171 | Fri Mar 06 14:22:48 2026 | Bong-Hwi Lim | General | Setup | Re: The beam target changed (same material but thicker one) -> beam rate increased |
ReplyTo: 165
Re: The beam target changed (same material but thicker one) -> beam rate increased
The current rate has been increased to | |||||
| 170 | Fri Mar 06 13:38:04 2026 | ono kyouhei | General | General | Line2: Changed the number of segments acquired from 100 to 500 |
Line2: Changed the number of segments acquired from 100 to 500取得セグメント数を100から500に変更しました | |||||
| 169 | Fri Mar 06 13:30:15 2026 | Bong-Hwi Lim | General | Setup | Re: The beam target changed (same material but thicker one) -> beam rate increased |
ReplyTo: 165
Re: The beam target changed (same material but thicker one) -> beam rate increasedthe number of segements updated from 100 to 500. it looks like the we had a lot of transfer during the one fill with 100 segment option. | |||||
| 168 | Fri Mar 06 13:26:12 2026 | Tatsuki Saito | General | Beam3_RFSoC | LINE3 DUT Change |
LINE3 DUT Change2列20umのセンサーを4列50um(穴なし)に変更しました | |||||
| 167 | Fri Mar 06 12:52:10 2026 | Bong-Hwi Lim | Error/Fault | General | Re: Line 2 DUT cable mismatch |
ReplyTo: 163
Re: Line 2 DUT cable mismatchNext time, the length of the cable, especially for the DUT has to be same for all channels. | |||||
| 166 | Fri Mar 06 12:51:01 2026 | Bong-Hwi Lim | General | General | The first safety key disabled (beam area) |
The first safety key disabled (beam area)The first safety key has been lost by manager (not our fault) → temporary disabled. Please contact him (Tokiyasu-san) if we can find the key in the beam area | |||||
| 165 | Fri Mar 06 12:49:18 2026 | Bong-Hwi Lim | General | Setup | The beam target changed (same material but thicker one) -> beam rate increased |
The beam target changed (same material but thicker one) -> beam rate increasedWe expect around 2 times more, but for the moment, we're observing ~4 Hz. | |||||
| 164 | Fri Mar 06 12:33:44 2026 | Simone Mazza | General | General | new DUT il line 2 |
new DUT il line 2Changed DUT in line 2, mounted 2col 30um, HV set at 197V | |||||
| 163 | Fri Mar 06 12:31:45 2026 | Simone Mazza | General | General | Line 2 DUT cable mismatch |
| 162 | Fri Mar 06 12:27:58 2026 | Tatsuki Saito | General | Beam3_RFSoC | HV Scan: 3/6 8:30~11:49 |
HV Scan: 3/6 8:30~11:49
DUT1 : 4col-20um, DUT2 2col-20um | |||||
| 161 | Fri Mar 06 10:04:38 2026 | Hiroki Iizuka | General | Beam3_RFSoC | Re: RFSoC channel and DUT sensor channel correspondence |
| 160 | Fri Mar 06 10:00:51 2026 | Hiroki Iizuka | General | Beam3_RFSoC | 3/6 シフターやることリスト |
3/6 シフターやることリスト
可能ならDUT変更もはさみつつ、beam については上記のrun をとる | |||||



